With a view to further promote ‘Green Energy’ in the State, Gujarat government has cleared proposals worth Rs 13.61 crore for installation of solar plants to power as many as 15 water treatment plant and/or sewage plants of 11 nagarpalikas (municipalities).
These solar plants would generate approximately 2,835 kW power and save Rs 2.94 crore in the electricity bills.
The plants will be installed for Bardoli, Umargam, Botad, Songadh, Vijalpore,Ankleshwar, Jambusar, Navsari, Vyra, Unjha, and Surendranagar nagarpalikas.
Notably, Gujarat occupies 6.39% of India’s geopolitical area but has access to only 2.28% of the country’s water resources, which makes it imperative for the water-stressed state to explore the option of reusing treated waste water.
The state government took a lead by coming up with a policy in year 2018 for reuse of treated waste water. The policy envisions maximizing the collection and treatment of sewage generated, and reusing the treated waste water on a sustainable basis, thereby reducing dependency on fresh water resources.
The policy aims to reach minimum 80% coverage and collection of sewage in all municipal towns, and achieve a level of 100% treatment of collected sewage as per the prescribed standards.
Eventually, the policy aims to reuse 70% of treated waste water by 2025 and scale it up to 100% by 2030.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.
By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.
Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so.
You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled.
Further information on data privacy can be found in our Data Protection Policy.