A UK-German research team analyzed solar auctions in India between 2014 and 2017 and has determined that local content requirements have driven up PV costs by an average of 6% per kilowatt-hour.
The country’s electric bus market has gained momentum owing to aggressive government push through FAME India [Faster Adoption and Manufacturing of (Hybrid &) Electric Vehicles in India] scheme and increased interest from global investors.
As of June 30, the country installed 90.5 GW of renewable energy capacity from solar (utility-scale and rooftop), wind and biomass resources.
Solar curtailment might become a valuable aspect of future PV deployment, particularly if grid operators start focusing on ‘curtailment management’ instead of ‘curtailment prevention.’ Management would include measures such as flexible generation, storage, load flexibility, and regional coordination.
Solar panels at the railway coach manufacturer’s three factories in West Bengal will cover approximately 50,000 sq m of roof space and generate around a quarter of the power used by the company each year.
The solar plant, in drought-prone Rajasthan, features a water-free robotic cleaning mechanism which also saves on labor costs.
The Rajasthan-headquartered engineering, procurement and construction company commissioned the project as part of a 40 MW solar park in Bhiwani district. The business has an ambitious renewables plan for the state with 150 MW in its two-year pipeline.
The system will use an innovative solar film developed by Power Roll that can be manufactured for just $0.03/Watt and deployed on a wide range of non-load bearing buildings, including agricultural and warehouse roofs.
The region could, by 2050, cut greenhouse gas emissions from power, heat, transport and desalination which are expected to add up to more than 825 metric tons of carbon dioxide equivalent this year. Such a transition could be perfectly possible, technically and financially.
Petroleum and natural gas minister Dharmendra Pradhan said India had received proposals for more than 10 GW of solar equipment manufacturing capacity under the Atma Nirbhar Bharat Abhiyaan mission announced by Narendra Modi.
This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.