The digital platform automates the entire distributed solar project design and net metering approval process, which is crucial in today’s era of social distancing and remote business operations driven by COVID-19 globally.
For one of India’s largest foreign investors, it’s time to invest in renewables.
A new, non-destructive technique has been proposed by researchers who say identifying early-stage discoloration in EVA encapsulants can help detect degradation in solar panels before power output is affected. The IIT Bombay group used an ultraviolet accelerated aging test during 34 days on three encapsulant samples.
The government has been quick to announce major infrastructure projects for Ladakh, realizing the union territory’s potential for production of solar energy, which could be a boon for the entire country.
U.S.-owned analyst Wood Mackenzie expects solar demand to decline but predicts the market will recover, with the prospects for the energy transition remaining intact.
The grid-connected, ground-mounted projects—to be set on turnkey basis—shall come up at Chennur (11 MW) and Kothagudam (23 MW) sites of Singareni Collieries Company Limited (SCCL). Bids can be submitted till April 20.
Under joint venture ‘Shuchi Anant Virya,’ Fourth Partner Energy has commissioned solar powered charging facilities in Gurugram and Pune which will enable commercial electric vehicle (EV) fleet operator Lithium Urban Technologies to charge around 30 and 40 EVs, respectively, at the same time.
The state has an overall potential of generating 17,755 MW of electricity from floating solar over 877 sq.km of water surface area in its reservoirs.
The selected developers shall set up renewable power projects on build-own-operate basis anywhere in India and complement the generated renewable power with thermal power, if needed, to ensure round-the-clock power supply.
The renewables business of the conglomerate will undertake its first project across the border by providing engineering, procurement and construction services on a Rs12.6 crore, 3.1 MW array for a German-Bangladeshi knitwear company which will buy the power generated for Rs5.71518/kWh.
This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.