Goldi Solar supplies 12 MW of modules for a Tamil Nadu project

Share

Goldi Solar, a Gujarat-based solar panel manufacturer and EPC provider, has announced it has completed the supply of 12 MW of solar modules for a project installation by Tamil Nadu-based EPC company Peak Qualish Systems.

The modules are installed at Aviyur, Viruthunagal, in Tamil Nadu, for a project commissioned in May 2021. Goldi’s 72GN polycrystalline modules with peak power output of 335W each were used in the project.

Goldi Solar currently operates a 500 MW state-of-the-art manufacturing facility on the outskirts of Surat, and is looking to expand to 2.5 GW with a second facility soon. It has shipped more than 500 MW of modules to 20+ countries globally.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Solar panel price drop in November may mark end of downward trend
23 November 2024 Martin Schachinger, founder of pvXchange.com, says the 8% price drop in November for solar modules could mark the end of sustained declines, as market...