Bidding extended for 200 MW solar in Uttar Pradesh

Share

Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) has extended the bidding for a cumulative 200 MW of grid-connected solar power projects to be developed in Uttar Pradesh. The revised deadline is November 30. Technical bids shall open on December 1.

The capacity is to be developed in UP Solar Park located at Kanpur Dehat and Jalaun districts. The projects shall be awarded based on international competitive bidding.

Uttar Pradesh aims to generate 10.7 GW of electricity from solar energy by 2022. Of this, 6.4 GW will come from utility-scale projects and 4.3 GW from grid-connected solar rooftop. The target will be increased to 15 GW and 8.5 GW, respectively, by 2030.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Solar panel price drop in November may mark end of downward trend
23 November 2024 Martin Schachinger, founder of pvXchange.com, says the 8% price drop in November for solar modules could mark the end of sustained declines, as market...