Waaree obtains ALMM approval for 4.75 GW of solar module capacity

Share

Mumbai-headquartered Waaree Energies has secured approval for the maximum module capacity by the Ministry of New and Renewable Energy (MNRE) for use in government-backed projects.

The approval covers projects set up to sell electricity to the government. Waaree is now the only manufacturer to have 650 Wp modules approved for such projects.

The MNRE’s Approved List of Models and Manufacturers (ALMM) features 18.05 GW of capacity from 28 manufacturers, including 4.75 GW per year from Waaree alone, or about 26% of the total. Out of 4.75 GW, Waaree has 2.65 GW enlisted for high-wattage modules (540 Wp, 600 Wp and 650 Wp). It is also the only manufacturer to have 650 Wp modules listed under the ALMM.

Waaree currently operates four PV module manufacturing facilities in India, in Surat, Chikhli, Tumb, and Nandigram. It has shipped solar modules to customers in 19 countries and has been ranked as a Tier-1 PV module manufacturer by BloombergNEF (BNEF) for four consecutive years, from 2018 to 2021. Recently, it was recognized as a top performer in PV Evolution Labs’ (PVEL) 2022 PV Module Reliability Scorecard.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

JSW Energy acquires O2 Power
28 December 2024 JSW Energy Ltd has acquired O2 Power, a 4.7 GW renewable energy platform, at an enterprise value of INR 12,468 crore ($1.47 billion).