NCRTC opens bids for rooftop solar in Delhi-Ghaziabad-Meerut rail corridor

Share

The National Capital Region Transport Corporation (NCRTC) has invited bids to install RESCO mode rooftop solar plants in the Regional Rapid Transit System (RRTS) corridor project connecting Delhi, Ghaziabad, and Meerut.

The prospective contractor’s scope of work includes design, engineering, supply, installation, testing, and commissioning of the rooftop solar project and associated support structure works. It will also provide comprehensive operation and maintenance support for 25 years post-commissioning.

The completion period for the project (including commissioning) is 15 months.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Waaree Energies approves investment in 300 MW electrolyzer, 3.5 GWh lithium-ion battery cell units
23 December 2024 Waaree Energies' board of directors has approved investment in setting up a 300 MW electrolyzer manufacturing plant and a 3.5 GWh Lithium-ion battery...