The Hydrogen Stream: FNB Gas presents hydrogen network plan for Germany

Share

From pv magazine Global

FNB Gas says Germany’s hydrogen core network, spanning 9,700 km, will cost around €20 billion ($21.6 billion) by 2032. The transmission system operator said that repurposing existing natural gas pipelines for the hydrogen network will be a cost-effective and rapid approach. The privately financed project has support from the German government through various programs, including subsidies to expedite planning procedures.

Tree Energy Solutions has presented the $4 billion Projet Mauricie in Canada, featuring an electrolyzer and 1 GW of renewable energy assets. The Belgian startup said that, upon commissioning in 2028, the project will produce 70,000 tons of green hydrogen exclusively for end users in Quebec. Approximately one-third of the green hydrogen will target long-haul transportation, with the rest to be used for electric renewable natural gas (e-NG) production.

H-TEC has delivered a 1 MW PEM electrolyzer to Hydrogen Lab Bremerhaven (HLB), a Fraunhofer Institute research project in Germany. The electrolyzer is part of a test field focusing on wind energy for hydrogen production. The test infrastructure at HLB allows scientists to explore the interaction between wind turbines and electrolyzers under real-life conditions. It said that PEM electrolysis is selected for its adaptability to fluctuating energy sources like wind energy.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Solar panel price drop in November may mark end of downward trend
23 November 2024 Martin Schachinger, founder of pvXchange.com, says the 8% price drop in November for solar modules could mark the end of sustained declines, as market...