Solar Energy Corp. of India (SECI) has extended bidding for the installation and commissioning of a 25 MW AC (50 MWp DC) solar PV plant with 20 MW/50 MWh battery storage in Leh to June 18.
SECI had invited bids to install and commission a 25 MW AC (50 MWp DC) solar PV plant with 20 MW/50 MWh battery energy storage system at Taru in the Leh district of Ladakh, in April this year.
The successful bidder’s scope includes design, engineering, supply, construction, erection, testing, commissioning and ten-year operation and maintenance of the PV plant with battery storage.
For the supplies to be done under this tender, both the solar cells and modules must be made in India and modules must be from the manufacturers listed in the Approved List of Models & Manufacturers [ALMM list], published and updated by the MNRE from time to time.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.
By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.
Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so.
You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled.
Further information on data privacy can be found in our Data Protection Policy.