Cliantech to supply 1.2 GW automated production line for Alpex Solar

Share

Cliantech Solutions will install a 1.2 GW fully automated solar panel manufacturing line for Alpex Solar’s new facility in Mathura, Uttar Pradesh.

Cliantech Solutions has partnered with solar production equipment companies such as Gaorun, ensuring its customers access to the latest technology at low cost. The suppliers in Alpex Solar project are Gaorun (line automation), Visual (laminators), Asicpy (EL tester), and HSPV (Sun simulator/IV tester).

Alpex Solar, a solar panel manufacturer based in North India, recently acquired land at Kosi Kotwan in Mathura from the Uttar Pradesh State Industrial Development Authority (UPSIDA) for its new facility. The land is spread over 7 acres and is well located on National Highway 19, which provides excellent logistics and vendor support.

With the addition of the new facility, Alpex Solar’s total PV module capacity will increase to 2.4 GW by the end of 2025.

Ashwani Sehgal, managing director of Alpex Solar, highlighted the importance of the new location for the company’s expansion plans, noting its easy access and logistical advantages. “The industrial area at Kosi Kotwan in Mathura is almost an extended part of NCR, easily accessible through the National Highway within an hour’s distance, providing logistical and vendor support advantages,” said Sehgal.

Cliantech Solutions has over 20 years of experience in the solar industry and has a large presence in equipment installations across the country.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Solex Energy commissions 800 MW solar module line
03 February 2025 Solex’s new line is tailored for mass production of n-type, rectangular-cell TOPCon solar modules ranging from 585 Wp to 625 Wp.