NTPC launches 250 MW/500 MWh standalone battery storage tender

Share

NTPC Ltd has invited bids to develop 250 MW/500 MWh of grid-connected standalone battery energy storage system (BESS) at its Gadarwara and Solapur sites.

The prospective developer’s scope of work includes supply and transportation of the containerized battery storage, battery inverters/PCU, energy management systems (EMS) up to the respective project site; design and engineering of the BESS and integration of BESS and EMS with the grid and balance-of-system (BoS) infrastructure; comprehensive operation and maintenance of the equipment for project life; and commissioning of the BESS (battery, PCS and EMS).

Bidding closes on July 18.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Battery recycling: How advanced materials science is changing the game
27 November 2024 The future of battery recycling is promising spurred by continuous advancements in materials science, driving the development of more efficient and su...