GameChange Solar announced this week that it has secured a contract with Bondada Engineering Ltd for NLC’s 780 MWp solar project in Khavda, Gujarat. This contract marks GameChange Solar’s largest order at a single location outside the USA. With this addition, GameChange Solar’s project total exceeds 2.5 GW in Khavada alone.
GameChange Solar will supply its Genius Tracker 1P-2Row, with deliveries starting in the fourth quarter of 2024. Genius Tracker 1P-2Row cuts costs and speeds installation by having one controller manage two rows. It comes standard with preassembled components including the elimination of all washers.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.
By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.
Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so.
You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled.
Further information on data privacy can be found in our Data Protection Policy.