ONGC has invited bids to set up 1 GW of co-located wind-solar hybrid power projects (500 MW solar plus 500 MW wind) for captive consumption. The projects can be anywhere in India, as long as these are connected to the interstate transmission system. These are to be executed on lumpsum turnkey basis.
The successful bidder will be responsible for engineering, procurement and commissioning of the hybrid wind-solar project, along with comprehensive operation and maintenance for ten years.
The project commissioning period is 36 months from the award of contract.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.
2 comments
By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.
Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so.
You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled.
Further information on data privacy can be found in our Data Protection Policy.