ONGC launches 1 GW wind-solar hybrid tender

Share

ONGC has invited bids to set up 1 GW of co-located wind-solar hybrid power projects (500 MW solar plus 500 MW wind) for captive consumption. The projects can be anywhere in India, as long as these are connected to the interstate transmission system. These are to be executed on lumpsum turnkey basis.

The successful bidder will be responsible for engineering, procurement and commissioning of the hybrid wind-solar project, along with comprehensive operation and maintenance for ten years.

The project commissioning period is 36 months from the award of contract.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Challenges and opportunities for lithium-ion battery recycling in India
25 March 2025 A new study examines the current status of lithium-ion battery consumption, and challenges and opportunities in the Indian recycling landscape.