SJVN launches 1.5 GW/6 GWh renewables-plus-storage tender

Share

SJVN is seeking bids from developers to set up 1.5 GW of renewable energy projects backed with energy storage systems for assured peak supply of 6 GWh (1.5 GW x 4 hours).

The projects are to be developed on a build-own-operate (BOO) basis. They can be located anywhere in India and must connect to the interstate transmission system (ISTS).

The selection of developers will be done via tariff-based competitive bidding.

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Avaada Group commits INR 50,000 crore to renewables, storage projects in Madhya Pradesh
24 February 2025 Avaada Group said it will develop 6 GW of solar energy, 700 MW of wind energy, 2.1 GW of battery energy storage systems (BESS), and 2 GW of pumped sto...