KLK Ventures hits 1,300 solar pumps milestone in Jammu & Kashmir

Share

KLK Ventures has announced the launch of its new platform aimed at transforming farming in Jammu and Kashmir with sustainable solar water pumps under the PM Kusum Yojana. The platform will simplify the application process, provide ongoing support, and enhance post-installation services for farmers seeking affordable, renewable energy solutions for irrigation.

“The platform is designed to make the entire process seamless, from initial application to post-installation services. Farmers can apply online, and the KLK team will manage every stage: conducting site feasibility surveys, handling documentation, dispatching materials, overseeing pump installation, and conducting quality checks. To ensure long-term satisfaction, KLK will also provide post-installation visits to check the system’s performance,” stated KLK Ventures.

Under the PM Kusum Yojana, the government offers an 80% subsidy on the cost of solar water pumps, with farmers contributing only 20%.

KLK Ventures, a government-empanelled partner, has already installed more than 800 solar pumps in Jammu and 500 in Kashmir, and aims to reach a total of 3,000 pumps in Jammu and 2,500 in Kashmir. These pumps empower farmers, especially those in remote areas, by allowing them to irrigate their fields without relying on diesel or electric pumps, reducing costs and supporting eco-friendly farming.

The PM Kusum Yojana supports farmers in areas where electricity is not easily available. Farmers can install solar-powered pumps of up to 7.5 HP, and in special regions like Jammu and Kashmir, Ladakh, and other hilly areas, the subsidy is available for pumps of up to 10 HP. This helps farmers irrigate their fields without relying on expensive diesel pumps.

Akshat Jain, CEO of KLK Ventures, said, “The PM Kusum Yojana is a game-changer for farmers, especially in remote areas. By providing solar water pumps, we are not only helping farmers reduce their costs but also promoting the use of renewable energy in agriculture. Our aim is to complete the installation of all targeted pumps in Jammu and Kashmir.”

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Waaree Energies approves investment in 300 MW electrolyzer, 3.5 GWh lithium-ion battery cell units
23 December 2024 Waaree Energies' board of directors has approved investment in setting up a 300 MW electrolyzer manufacturing plant and a 3.5 GWh Lithium-ion battery...