NTPC Renewable Energy Ltd (NTPC REL) has invited bids for the balance of system (BoS) package to develop 1 GW (2x300MW+2x200MW) of grid-connected solar PV projects at Bikaner, Rajasthan.
The scope of work includes design, engineering, manufacturing, supply (excluding PV modules), installation, testing and commissioning, and comprehensive operation and maintenance of the solar PV plant along with electrical equipment, consumables, and spare parts for a period of three years from commissioning of the full project capacity.
Bidding closes on May 15.
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.
By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.
Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so.
You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled.
Further information on data privacy can be found in our Data Protection Policy.