Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) has invited bids to set up an aggregate 25 MW capacity of grid-connected rooftop solar systems at government/semi-government buildings in the state. The systems—in individual capacities of 25 kWp to 500 kWp—are to be installed under RESCO model on gross-metering basis. Bidding closes on August 12.
India’s Directorate General of Trade Remedies (DGTR) has determined that flat steel products coated with aluminium and zinc are being dumped by manufacturers in China at dumping margins of 30-50%, South Korea (20-30%) and Vietnam (10-20%). It has proposed anti-dumping duty based on the same to offset material injury to domestic manufacturers.
Private-sector utility Adani Electricity Mumbai Limited has invited global bids to set up 350 MW of grid-connected wind-solar hybrid power projects. There is also the Greenshoe option to add another 350 MW. The projects—to be developed on build-own-operate basis—can be set up anywhere in India. Bidding closes on August 9.
Bids are invited for supply of 75 Wp solar modules based on crystalline silicon technology. The modules must be made into 9×4 arrays using 36 solar cells each. Bidding will close on August 3.
As the country races to add or upgrade infrastructure for electricity transmission, it needs to take steps to encourage private investments as also lower consumer prices—according to a white paper by Confederation of Indian Industry that includes recommendations on planning, operations and costs for a robust transmission system.
“Lead-acid batteries are comparatively cheaper than other battery types such as Ni-MH and Li-ion. Moreover, these have the highest recyclability percentage of any product, and are therefore likely to find more takers owing to their reduced cost of production,” according to industry participants at the International Lead Conference held in Spain.
With India losing major solar markets to stiffer competition from cheaper products, it’s high time to change the game by playing on quality and innovation—according to Vikram Solar Chief Financial Officer Rajendra Kumar Parakh, who spoke to pv magazine on the challenge of shrinking markets before Indian solar manufacturers.
Micro and mini grid-connected projects will also be considered. Further, SECI has notified waiver of ISTS charges and losses and 6-month extension in the commissioning date.
Government-owned Central Electronics Limited has invited Expression of Interest for executing battery energy storage system projects on turnkey basis in India. The deadline for submission is July 31, 2019.
The charging stations should preferably be connected with grid-connected solar power plants of required capacity as per MNRE guidelines. The deadline for submission of the proposals is August 20.
This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.