Installations – Page 36 – pv magazine India
Skip to content

Installations

ABB to acquire Gamesa’s power electronics, storage business

ABB has agreed to purchase Gamesa’s power electronics and storage business, which produces doubly fed induction generator (DFIG) wind converters, industrial battery energy storage systems (BESS), and utility-scale solar inverters.

Acme Solar commissions 1,483 MWp in Rajasthan

Acme Solar has switched on four co-located solar projects aggregating to 1,023 MW AC (1,483 MWp) in Rajasthan. The capacity, connected to the interstate transmission system, constitutes 85% of the overall 1.2 GW project that benefits from a 25-year power purchase agreement (PPA) with SECI at a tariff of INR 2.44/kWh. 

Avaada Energy wins 200 MW (DC) solar project from GUVNL

Avaada Energy will develop a 200 MW (DC) solar plant for power supply to Gujarat Urja Vikas Nigam Ltd at a tariff of INR. 2.75 per kWh.

 

1

NTPC Renewable switches on 30 MW solar in Gujarat

The newly commissioned capacity is part of NTPC Renewable Energy’s 150 MW solar project across Limbdi, Mesanka and Radhanpur

India to mandate energy storage for solar, wind projects

India is likely to follow in the footsteps of China and mandate the inclusion of battery storage capacity for future wind and solar energy projects.

1

Coal India Ltd launches 1 GW solar EPC tender

Coal India Ltd has invited EPC bids for its 1 GW solar power project planned in Rajya Vidyut Utpadan Nigam Ltd’s solar park in Rajasthan. Bidding closes on Jan. 2.

Federal Bank, Ecofy partner on financing for MSME rooftop solar

The co-lending program targets financing 3,600 kW of rooftop solar installations annually, benefiting numerous micro-, small and medium-sized enterprises (MSMEs).

Gensol Engineering secures 22 MW C&I solar PV project in Punjab

Gensol Engineering Ltd has secured a 22 MW ground-mount solar PV project with an order value of INR 88 crore from a steel company in Punjab.

Shift to 2 kV voltage in solar projects tipped to gain traction

Amid record-low prices for solar modules, the focus of cost reduction for utility-scale solar projects is shifting to non-module balance-of-system (BoS) expenses. A transition from 1.5 kV voltage to 2 kV in solar projects is expected to gain traction through 2030.

IMFA forms joint venture with JSW Green Energy

Indian Metals & Ferro Alloys Ltd has formed a joint venture with JSW Green Energy to set up a hybrid wind-solar power plant for self-consumption.

This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close