Skip to content

Modules & Upstream Manufacturing

Indian PV procurement leapt to 3 GW in October figures

Developers gave short shrift to gloomy predictions about depreciation, protectionism and tax headwinds as tendering and auction figures soared, but they shied away from the tough price caps set for SECI’s procurement exercises.

Hits and misses among latest 10 GW solar tender amendments

While the timelines for PV power plant execution and completion of manufacturing facilities are now more realistic, production obligations – especially for capacity utilization – need to be revisited.

India powers ahead as Asia set for 355 GW of PV by 2023

Despite political hurdles in key markets including China and Japan, Asia remains highly active. This year, 59 GW of solar is expected to be installed and due to further system price declines, a phase-out of subsidy schemes can be offset.

‘SECI’s 10 GW solar tender will not attract big developers’

Big players such as Acme, ReNew, Adani, Azure, Hero Future and Aditya Birla Solar are likely to stay away from procurement which requires 3 GW annual manufacturing commitment, says industry insider Gopal Lal Somani.

2

The long read: “The potential gain from bifacial easily outweighs the risks”

An unexpectedly large gathering of international bifacial PV experts convened in Denver, USA in early September, at the 2018 bifiPV Workshop to trade notes on the performance of bifacial PV modules, lauded by some as the most promising advance in solar for a decade. pv magazine was in attendance.

1

India added world’s second largest PV capacity in first half of 2018

The nation installed 4.9 GW of solar, surpassing the USA – which installed 4.7 GW – to become the second largest solar market in the first half of the year, second only to China’s 24.3 GW.

SECI defers ‘world’s biggest’ solar auction until mid November

The bid submission deadline for the national 10 GW, inter-state PV project plus manufacturing tender is now November 12. According to officials, there are amendments to be made in the tender requirements, for which it is awaiting a ministerial mandate.

1

TOPCon: The next big thing after PERC

TOPCon technologies could further increase solar cell efficiencies, said Guangyao Jin, chief scientist, DuPont Photovoltaic Solutions, at this year’s Energy Taiwan, held in September. He added that metallization paste is crucial.

PM Modi: 40% electricity generation from non-fossils by 2030, up to $80 billion for PV manufacturing

India’s Prime Minister kick started the first Assembly of the ISA, the second IORA Renewable Energy Ministerial Meeting, and the 2nd Global RE-Invest yesterday in Greater Noida. The agenda of the day? Universal access to solar energy at affordable rates; securing 40% of India’s electricity generation from non-fossil fuels by 2030, and allocating up to US$80 billion to boost domestic PV manufacturing.

1

The long read: Backsheets to the future

As backsheet manufacturers aim to keep up with cost reductions up and down the PV supply chain, new processes and materials are appearing, with claims to offer better performance as a moisture barrier, as well as better acetic acid permeability and higher reflectivity, among other features. pv magazine examines the state of the market for PV backsheets, and takes a look at some of the new material innovations that are gaining ground with module manufacturers.

This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close