Skip to content

Policy

Haryana: the argument for a rollback of solar incentives

The state has withdrawn its transmission charges waiver for solar projects bigger than 500 MW in capacity. While unhappy developers are protesting, industry experts deem it sensible for the government to apply a limit to – and possibly plan a phased withdrawal of – incentives for the solar sector.

1

The long read: Materials matter

As problems with component failure have already laid bare, there is a clear need for contract clarity at every stage of a PV project, from material and component sourcing to power purchase and operations agreements. Here, pv magazine investigates a little covered issue for module buyers, which could threaten insurance coverage and the overall success of a project further down the line.

CREO 2018: A new era in the Chinese energy transition

A new era in the Chinese energy transition is on the menu and renewables are the order of the day, according to the latest China Renewable Energy Outlook (CREO). China will not require a gas bridge between coal and renewables, it finds, adding that renewables will become the core of the nation’s energy system by 2050, with annual PV installs of between 80-160 GW possible. Not only that, but electricity supply could be cheaper in this future than it is today.

MNRE: Preference will be given to domestically manufactured renewable energy products

The Indian Government has mandated that preference be given to domestically manufactured renewable energy products in public procurement. As per the order, 100% of the solar modules for grid-connected solar power projects must be domestically manufactured.

1

Intersolar India: EV program must be accelerated, storage on everyone’s lips

For India to achieve its 2030 dreams of fully electrifying its passenger vehicle market, and growing a leading manufacturing industry, its electric vehicle program must be accelerated. Meanwhile, if Intersolar India 2018 had to nominate the most-repeated word at the event, “storage” would win hands down.

1

India will auction 80 GW of solar, wind capacity by March 2020

The Indian Government plans to tender 60 GW of solar and 20 GW of wind capacity by March 2020. This would complete the planned auctions for its targets of 100 GW solar and 60 GW wind installations by 2022, leaving two years for project execution, according to an year-end review by the Ministry of New and Renewable Energy (MNRE).

Uttar Pradesh calls for $809 million private investment for 4 GW solar project

The Uttar Pradesh Government is looking for private investment worth Rs 55 billion (UD$809 million) for the proposed Bundelkhand Green Energy Corridor, which is expected to generate 4 GW of solar power.

2

Green Climate Fund signs $100 million pact for India’s rooftop solar

The Green Climate Fund (GCF) and the National Bank for Agriculture and Rural Development (NABARD) have signed an agreement to infuse US$100 million into an ambitious $250 million project designed to unlock private sector initiatives for the creation of rooftop solar power capacity across India.

Auroville search engine will crowdfund solar power for 100 villages in Tamil Nadu

Sustainable development expert Auroville Consulting has launched the Solar Village Search Engine to help fund its Solar Village Initiative, which aims to power 100 villages in Tamil Nadu with solar by the year 2030.

2

Tariff dips further in Uttar Pradesh

Ever tumbling panel prices have brought a fresh round of low solar power tariffs after an earlier 1 GW super tender was annulled in the state. The latest reverse auction was oversubscribed by almost 50%.

This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close